MP and UP jointly procure 500 MW pumped storage capacity
In short
Madhya Pradesh and Uttar Pradesh have jointly bought 500 MW of pumped storage capacity for seasonal needs. They will share the storage for six months each.
What the reporting says
Madhya Pradesh and Uttar Pradesh jointly procured 500 MW of pumped storage capacity for seasonal power needs. The arrangement lets both states share the storage capacity for six months each and includes a proposed 40-year power purchase agreement, with lower fixed costs.
Why it matters
Madhya Pradesh and Uttar Pradesh jointly procured 500 MW of pumped storage capacity for seasonal needs, with each state sharing it for six months. The arrangement is relevant for state power planning, seasonal demand management, and long-term electricity supply costs.