Signal Desk · Companies

NHAI engineer flags bridge bearings, joints in early cracks

2026-11-22 · 1 source · Mint Industry

In short

An NHAI engineer says neglected bridge parts are helping some highway bridges crack early in India. The research says bridges can start deteriorating within five to 10 years, even though they are designed for 100 years.

The study says bad installation, poor maintenance and not following specifications are major reasons.

What the reporting says

An NHAI engineer has linked early cracking in India's highway bridges to neglected bearings, expansion joints and drainage systems, according to research cited in the source summary. The study says many bridges deteriorate within five to 10 years even though they are designed to last 100 years. It cites incorrect installation, poor maintenance and departures from specifications as key causes.

Why it matters

An NHAI engineer’s research points to bearings, expansion joints and drainage systems as major reasons some highway bridges in India deteriorate far earlier than intended. The findings highlight the role of incorrect installation, poor maintenance and deviations from specifications in bridge damage.

Touches: NHAI, Government, Companies, Real Estate

Sources